Bug Reported : 236
Reported by Zimmer Canada | December 21st, 2017 @ 11:07 AM
Reporting Domain zimcan.opskwan.com
User 3543 : Aidan Dwyer : aidan.dwyer@zimmerbiomet.com
USER_AGENT Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:57.0) Gecko/20100101 Firefox/57.0
Steps Taken saved set assignments, and checked the "sets to ship" on logistics page, and system had already highlighted 6 of the 9 sets in green, as "already shipped" when I actually hadn't hit the Button yet.
Expected Result It should have waited for me to hit the button, before turning on the green highlight. (3 of them were still white, which is correct, but 6 had turned green already)..this is repeating issue, and can cause someone to think that sets have already shipped.
Actual Result 6 were changed to green ( Shipped) and 3 are still white. (not shipped) The check should only be done by the user. The system should not automatically check the box. Thanks, Aidan.
Link to Admin http://admin.opskwan.com/tickets/view/236
No comments found
Please Sign in or create a free account to add a new ticket.
With your very own profile, you can contribute to projects, track your activity, watch tickets, receive and update tickets through your email and much more.
Create your profile
Help contribute to this project by taking a few moments to create your personal profile. Create your profile ยป
This Lighthouse Project covers the suite of 3 OpsKwan apps:
[yourcompany].opskwan.com
[yourdistributor].opskwan.com (including the mobile version)
[yourhospital].opskwan.com